Ag-Bag M925 Machine
The machine folds into the road transportation position and is moved around the sites using a fast tractor. |
|
Working Position
On site the machine becomes self propelled with the capability of travelling in almost any direction to get into the tightest spaces. The required working site width is 6.5 mts (21 feet ) |
|
Machine set up
Once on site It takes approximately 30 minutes to set up ready for bagging. A 60 metre (200 tonne ) pod can be completed in less than 2 hours. Maximum daily output around 1000 tonnes. |